"When the well runs dry, we will know the worth of water." -- Benjamin Franklin
Our team are experts in the design and construction of MWELO/AB-1881 compliant Water Conservation
Demonstration Gardens, including new garden construction, and reconstruction. Through innovative design,
state-of-the-art technologies, and practical water conservation strategies, a Water Conservation
Demonstration Garden by AQUASave provides excellent educational and community outreach opportunities.
Irrigation and Landscape ‘Build” Phase Soil Testing – Soil analysis can disclose problems that could be dealt with
during the soil amendment process.
Soil Amendment – The existing grasses are killed then re-mulched, or
incorporated into the root zone, along with the natural organic amendment
materials recommended in the soil test report.
Weed Grow and Kill – Original plants that are removed will have a tendency
to return during establishment of the new planting. Therefore, after the soil
amendment, a period of irrigation to germinate potential weeds and re-grow
Irrigation Retrofit – As cost reduction strategy, irrigation designs may
include use of existing infrastructure. The result is the inclusion of several
customized construction procedures as well as the use of:
Landscape Planting – Special drought resistant sod and primarily one gallon
sized plants were installed to insure that the new root systems would be
vigorous and become established quickly.
Landscape Establishment – A 90 day period of intensive plant
establishment care immediately followed the completion of the planting.
Pre-construction GPS Irrigation and Landscape Audit Establishes baseline data based on a digital base plan of existing/original irrigation
and landscape in support of the planning process and ROI measurements.
Provides an accurate digital record of the location of the existing irrigation equipment
[valves, lines and heads] to allow the designer to accurately depict the configuration
of the new more efficient system.
Provides an accurate digital record of the location of the existing plants, which allows
the designer to accurately depict which plants will be retained or replaced. A
pre-construction GPS landscape audit can also provide an evaluation of the ‘before’
level of carbon offset.
Golden State Water, San Dimas, CA
September 2009 - Pre Construction GSW Project Gallery
Rotator and Precision nozzles installed at appropriate
locations replacing the original Spray and/or Stream
Rotor heads
Surface flow and other low volume installations along
all non-porous surfaces and some of the turf areas
Golden State Water, San Dimas, CA
October 2009 - Build Phase
Golden State Water, San Dimas, CA
October 2009 - Build Phase GSW Project Gallery
Post-Construction GPS Audit & Establishment Maintenance Provides an accurate confirmation that the newly installed irrigation system meets
the goals established in the design and the concepts of the AB-1881 ordinance.
Establishes baseline and comparitive data for newly installed irrigation system
60-days of establishment mainentance to ensure
Additional Features Water Conservation Demonstration and Learning Center - An area dedicated
to outreach and education with support for schedule educational programs, seminars
and training sessions.
Retrun on Investment – Measurable and targeted ROI from water, power, and
infrastructure maintenance cost savings/
Water Runoff Control – Mitigation of water runoff problems generating cost
savings, and reduction of potential public liability and pollution fines
Golden State Water, San Dimas, CA
December 2009 - Post-Construction GSW Project Gallery
Contact an AQUASave Network program representative today to request
a Water Conservation Demonstration Garden consultation.